Case studies
AC1000/9 First lift
The quick setup time resulted in LCR mobilising to site, performing the lift and demobilising from site over three nights.
Wind turbine maintenance
LCR was recently engaged by a renewable energy client to assist in maintenance works on a windfarm facility based in South Western Queensland.
Removal of walkway panels
LCR utilised a SCX–1500 crawler crane to provide ample capacity and the ability to track alongside the drydock.
Dam maintenance works
Maintenance works on Paradise Dam included the supply of multiple slew cranes over 100t capacity crewed both day and night on a 24/7 roster.
Tabulam bridge replacement
In conjunction with our client, LCR Group devised an innovative and cost-effective plan to complete the construction of the bridge over the Clarence River.
Transformer logistics
LCR recently executed a high-level logistics program for a Renewable Energy client to perform the lift n shift requirements for two 196t Transformers.
GET IN TOUCH
1300 554 458
494 Nudgee Road, Hendra QLD 4011
© 2022 LCR Cranes & Transport - a QUBE Company