AC1000/9 First lift

AC1000/9 First lift

AC1000/9 First Lift Within days of taking delivery of our new Tadano Demag AC1000-9 LCR has deployed the crane to its first project. The crane was contracted to remove (2) cross beams on a gantry crane on a project in inner-city Brisbane. Given the substantial...
Wind turbine maintenance

Wind turbine maintenance

Wind turbine maintenance LCR was recently engaged by a renewable energy client to assist in maintenance works on a windfarm facility based in South Western Queensland. LCR Group supplied an AC500-2 in superlift and luffing fly configuration to reach the required hook...
Removal of walkway panels

Removal of walkway panels

Removal of walkway panels Through the process of planning, innovation and design, LCR and our client were able to identify the correct methods and engineering controls to safely mitigate the risks associated with the unstable walkway panels and working over water. As...
Dam maintenance works

Dam maintenance works

Dam maintenance works Paradise Dam maintenance works LCR Group Pty Ltd worked has been engaged by a contractor to complete maintenance works on Paradise Dam. The scope included the supply of multiple slew cranes over 100t capacity crewed both day and night on a 24/7...
Tabulam bridge replacement

Tabulam bridge replacement

Tabulam Bridge Replacement Tabulam Bridge Replacement LCR Group Pty Ltd was engaged by civil contractor to assist in the heavy lift operations at the Tabulam Bridge replacement program in Northern NSW. In conjunction with our client, LCR Group devised an innovative...