Tabulam Bridge Replacement

Tabulam Bridge Replacement

LCR Group Pty Ltd was engaged by civil contractor to assist in the heavy lift operations at the Tabulam Bridge replacement program in Northern NSW.

In conjunction with our client, LCR Group devised an innovative and cost-effective plan to complete the construction of the main bridge on the Bruxner Hwy over the Clarence river.

Over multiple visits, LCR Group completed the installation of the pre-cast girders utilising a 500t all-terrain crane. LCR Group delivered what we promised on time and the highest level of safety.

Utilising a 500t all-terrain crane, LCR delivered what we promised on time and the highest level of safety.

Case studies

AC1000/9 First lift

AC1000/9 First lift

The quick setup time resulted in LCR mobilising to site, performing the lift and demobilising from site over three nights.

read more
Wind turbine maintenance

Wind turbine maintenance

LCR was recently engaged by a renewable energy client to assist in maintenance works on a windfarm facility based in South Western Queensland.

read more

GET IN TOUCH

1300 554 458

494 Nudgee Road, Hendra QLD 4011

© 2022 LCR Cranes & Transport - a QUBE Company